CGNS Steering Committee
Telecon Minutes
2 July 2008
- The meeting was called to order at 11:00 AM eastern time. There were
8 attendees, listed below.
- The minutes of the 7 May 2008
meeting were approved as posted on the web site.
(Rumsey noted a missing action item, but it will be added to the
action items for this telecon: Wedan and Hauser to look into
improving documentation and build instructions for V3.0).
- Extensions status
- Regions proposal was approved. It is now listed on the
website as "accepted: awaiting implementation in MLL."
- There is also an earlier approved extension (Multiple
zone connectivities for time-dependent) still awaiting
implementation in MLL.
- New Allmaras proposal for "General SIDS improvement" has been
posted. This proposal is for storing edge and face-based data,
and creating uniformity across the SIDS. Deadline for comment
is August 1, 2008.
- New Poinot proposal for "Rigid motion improvement" has been
posted. Deadline for comment is September 1, 2008.
- Rumsey to e-mail committee to remind them to comment on new
extensions.
- Status of previous action items
- Hauser will lead a mini-telecon for those involved with
Regions on May 13.
- Done. Regions extension was finally approved.
- Wedan to remove instructions regarding XML output from
configure script in V3.0.
- Not done yet. Hauser to take on this action item.
- Hauser to look into the issue of bundling HDF-5 with the CGNS
release of V3.0.
- Bundling OK as long as HDF-5 copyright kept intact.
- Decision made for V3.0: bundle in HDF-5. If user does
nothing special, "make" will automatically create library
with HDF-5 capability, using bundled software. If user
specifies, it will either make with user's version of
HDF-5, or will not make with HDF-5 at all.
- Hauser to make HDF-5 part of V3.0's tar file
distribution, and set up makefile appropriately.
- Hauser to contact vendors regarding testing V3.0 prior to
release if possible and report back to committee.
- Not done yet. Action item carries.
- Hauser will add HDF-5 parallel code to SourceForge and will let
users know when it is available.
- Not done yet. This will be done after V3.0 is released.
Action item carries.
- Towne and Rumsey to add NGON_n + NFACE_n
documentation into V3.0 SIDS.
- Done. There was discussion regarding Towne's question
about whether there should be a rule for NGON_n
regarding ordering the nodes. Allmaras felt a general
rule probably was not possible in 3-D. The suggestion was
made that perhaps it should be suggested in the SIDS that
NGON_n be used for 2-D only (in this case one
could enforce counterclockwise node ordering), and for
3-D one must use NGON_n only when in combination
with NFACE_n. Rumsey to email Towne and Wedan
about the issue of node ordering for NGON_n.
- Rumsey to send email to committee members describing NGON_n +
NFACE_n and ask them to try it out.
- Done.
- Allmaras to finalize Regions proposal modification,
including proposed additions to FlowSolution,
DiscreteData, BC, and BCDataSet and
send to Rumsey for posting on website.
- Done.
- Paul, Bussoletti, and Allmaras to look into finding development
(particularly for MLL implementation) resources at Boeing.
- Some discussions have been held at Boeing. They are
considering enterprise-wide commitment of person/people
resources to CGNS, since 3 significant projects in the
company currently use it. It is seen as an investment,
but commitment of money is unlikely.
- Action item carries.
- Duque and Hauser to assume lead on new discussion/proposal for
handling sprays of unconnected points.
- Ongoing. There are still some questions that need to
be resolved, such as: is the assumption of a spherical
particle at each point sufficient, or is handling of more
complex shapes needed? Action item carries.
- Rumsey to look at posting a specific checklist on the
website on what to put in a proposal for extension.
- Duque and Hauser have also been looking into possible NSF
funding for CGNS. They plan to continue to pursue this,
and also possibly look into the idea of a collaborative
of industry partners - to try to secure funding in order
to sustain CGNS software development. Intelligent Light
would be willing to help spearhead this effort, and
manage the collaborative. Duque and Hauser to continue to
pursue NSF funding and look into idea of a fundraising
collaborative.
- Hauser, Rumsey, and Poinot to continue to explore possible
CGNS meeting in Europe.
- Ongoing. A possibility is EUCASS 2009 in France (July
2009). Rumsey will contact EUCASS 2009 conference
organizers about possibility of having CGNS sessions
and/or tutorial.
- Rumsey suggested we should also consider writing a CGNS
status paper for the AIAA summer meeting in San Antonio
in June 2009. Abstract deadline would be Oct 2008
timeframe. Hauser and Rumsey to consider writing abstract
on CGNS progress for AIAA summer 2009 conference.
- Poinot to send necessary coding changes for HDF-5 linking to
Hauser for implementation into V3.0 alpha version.
- Done. Hauser to merge Poinot's changes related to HDF-5
linking into V3.0.
- Hauser to look into methods on SourceForge for getting Poinot
developer access: switch from CVS to SVN? or use SSL?
- Poinot will check if CVS is working for him, if not
Hauser will look into moving to SVN using SSL?
- Hauser to speak to Koziol at HDF-5 Group about issues related
to developers and funding.
- Not done yet. Action item carries.
- Wedan to investigate issue of MLL deleting the entire node
even though its new dimensions are the same.
- Not done yet. Action item carries.
- Hauser will take control of domain name and will consider
possibility of moving website to Utah State site.
- Hauser is waiting for an invoice from ANSYS before he
pays for the rights to the domain name. Action item
carries.
- Hauser to contact Hunten about ISO/STEP and ask the best way
for us to comment.
- Not done yet. Action item carries.
- Open items (purpose of these is to not lose track of long-term
issues that come up)
- Keep track of/resolve HDF-5 "to-do" list
- Many of these items are now completed for V3.0.
- Keep track of progress with ISO/STEP.
- Need for official certification process (test for compliance).
- Develop method to write info one element at a time to save
memory via something like cg_section_partialwrite
(Miller 10/19/07 CGNSTalk)
- Address issue of possible need for "long" instead of "int" to
avoid signed 2 Gig limit (Miller 10/19/07 CGNSTalk).
- Next Telecon is tentatively set for September 3, 2008.
- Summary of action items:
- Wedan and Hauser to look into improving documentation and
build instructions for V3.0.
- Rumsey to e-mail committee to remind them to comment on new
extensions.
- Hauser to remove instructions regarding XML output from
configure script in V3.0.
- Hauser to make HDF-5 part of V3.0's tar file distribution, and
set up makefile appropriately.
- Hauser to contact vendors regarding testing V3.0 prior to
release if possible and report back to committee.
- Hauser will add HDF-5 parallel code to SourceForge and will
let users know when it is available.
- Rumsey to email Towne and Wedan about the issue of node
ordering for NGON_n.
- Paul, Bussoletti, and Allmaras to continue to look into
finding manpower development (particularly for MLL
implementation) resources at Boeing.
- Duque and Hauser to continue to develop proposal for handling
sprays of unconnected points.
- Rumsey to look at posting a specific checklist on the website
on what to put in a proposal for extension.
- Duque and Hauser to continue to pursue NSF funding and look
into idea of a fundraising collaborative.
- Rumsey will contact EUCASS 2009 conference organizers about
possibility of having CGNS sessions and/or tutorial.
- Hauser and Rumsey to consider writing abstract on CGNS
progress for AIAA summer 2009 conference.
- Hauser to merge Poinot's changes related to HDF-5 linking into
V3.0.
- Poinot will check if CVS is working for him, if not Hauser
will look into moving to SVN using SSL?
- Hauser to speak to Koziol at HDF-5 Group about issues related
to developers and funding.
- Wedan to investigate issue of MLL deleting the entire node
even though its new dimensions are the same.
- Hauser will take control of cgns.org domain name and will
consider possibility of moving website to Utah State site.
- Hauser to contact Hunten about ISO/STEP and ask the best way
for us to comment.
Attendees
| Steve Allmaras |
| Boeing Commercial
|
| Pat Baker |
| Pointwise
|
| Earl Duque |
| Intelligent Light
|
| Thomas Hauser |
| Utah State
|
| Simon Pereira |
| ANSYS / ICEM CFD
|
| Greg Power |
| USAF/AEDC
|
| Chris Rumsey |
| NASA Langley
|
| Kurt Weber |
| Rolls Royce / Allison
|
Tentative to-do list in association with HDF-5 switchover
- Complete and test parallel implementation
- Complete and test API capability to automatically detect and switch
between ADF and HDF-5 (transparent to user?)
- Assess/minimize impact on software vendors using CGNS
- under development (success with automatic detection transparent
to user will minimize impact)
- Make changes recommended by HDF-5 to improve usability with HDF-5
(e.g., character strings as opposed to character arrays)
- Assess compression capability of HDF-5
- CGNS configure scripts will need to be modified to check for
availability of appropriate HDF-5 libraries.
- Possibly add flag-based options when opening CGNS files. For
example: "follow links" vs. "don't follow links"; "use ADF" vs. "use
HDF-5"; "translate file automatically" vs. "leave the file as-is";
"compress" vs. "don't compress".
- Look into eliminating need for ID's from MLL
- Resolve "link-of-links" problem: will require HDF-5 fix by NCSA
under development (1.8.0 beta)
- done in V3.0 in combination with HDF-5 V1.8